Product introduction

Mulgube

Mulgube

Application
– Partial reinforcement on roofs
– Reinforcement on defect area on urethane and epoxy
– Construction on floor surface in parking lots, factories, and warehouses
– Background adjustment before construction on tiles and floors and repair and reinforcement of previous concrete
Product configuration
Water gradient is reinforcement mortar composed of cement, chemical additives, and silica and has excellent adhesion to floors. It can be easily applied for working and level adjustment with previous floors. It is a high-strength reinforcement mortar creating 3 times higher strength compared to previous mortars. If it is poured into floors, it is automatically spread out and follow-up work can be carried out the next day.
Product characteristics
– Work and level adjustment is easy and it has excellent adhesion with the ground.
– Follow-up work can be carried out in the next day for up to 3–30 mm in different thickness (at room temperature).
– No cracks occurred from difference in heat expansion rate.
– Since it is an exposure type, it can be applied for construction on rooftop floors and indoor floors.
Product characteristics
Recommended thickness 3,000㎛
Usage per package 7㎡
How to use and caution
How to use – Temperature of the construction surface should not be too high or low and lifted part and laitance should be removed and cleaned with high-pressure cleaner.
– Water grading is applied after working on primer and follow-up work should be carried out 24 hours later.
– Pour water (3.8 ℓ at pack/20kg) and powder and mix them using a stirrer.
– Pour the water gradient on the floor surface and apply pressure using plastering knife to spread it in desired thickness.
– In case of carrying out construction in wide area, adjust the construction time so that construction can be continued within 200 minutes and deviation is not occurred.
caution – – Excessive amount of water may lead to crack occurrence and reduction in strength.
– If freezing is expected after construction, work should not be carried out. In case of construction while temperature is high, apply touch drying and sprinkle water.