Product introduction

Non-slip

Non-slip

Application
– Bronze material floors, stainless floors, slippery floors,
– resistance to chemical substance is required
– resistance to abrasion is required
– Stairs feared for contamination or corrosion in everyday life.
Product configuration
Bronze material floors, stainless floors, slippery floors, place where water is frequently used, resistance to chemical substance is required, resistance to abrasion is required, contamination or corrosion might be occurred in daily life
Product characteristics

– It can effectively solve the problem of slipperiness in floor pads.
– By combining with air pollutant, it can effectively suppress the corrosion, contamination, and oxidation.
– It can ensure a clean state for a long time after construction.

How to use and caution
How to use 1. Pre-processing
– It removes laitance (foreign substance hindering adhesion) on slippery floor surfaces.
– It is recommended to use a cleaning tool due to slipperiness.
2. Taping work in surrounding area
– It is recommended to carry out taping work to prevent contamination in surrounding area.
3. Transparent 1st coating
– In case of carrying out 1st coating, mix the “main agent” and “hardening agent” sufficiently.
– Spread the “1st coating agent” using a brush.
– Carry out precision construction and be careful so that coating agent does not flow down.
– After the 1st coating work is completed, allow to dry for 2 hours.
4. Transparent 2nd coating
– After the 1st coating, apply 2nd coating when walking is possible.
– In case of carrying out 2nd coating, mix the “main agent” and “hardening agent” sufficiently.
– Spread the “2nd coating agent” using a brush.
After the work is completed, allow to dry for 4 hours.
– After the 2nd coating is completed, check if walking is possible. It can be different depending on the temperature of slippery surface.
caution 1. In case of working, workplace should be thoroughly controlled.
– It should be thoroughly controlled so that stepping on it does not occur before hardening.
– Off-limits signs and obstacles should be installed and access should be thoroughly controlled during night time.
2. “1st coating agent” and “2nd coating agent” should be separated.
3. Be careful so that paint is not spread on other parts except for slippery floor pads.
4. Precision construction should be carried out since it is difficult to remove poor construction.
5. Construction cannot be carried out in the following environments.
– When the air temperature is or is expected to be 5℃ or under
– When it is rainy or relative humidity is 70% or higher
– When the air temperature is 40℃ or higher
6. It should not be exposed to direct sunlight and should be stored in cool environments in indoor areas.
7. Storage period is 6 months after the manufacturing date.